WHY PROBLEMS OCCUR

The air tightness, continuity, structural integrity and durability of the air barrier system are dependent upon three factors; materials, design and installation practice. Flaws in any of these elements can have negative ramifications on the ability of the completed system to perform to specification in the short and/or long run.

Materials

When specifying air barrier materials, the designer must confirm that the material or materials chosen have an air permeance rating equal to or less than 0.02 L/(s·m2) measured at an air pressure difference of 75 Pa. Many materials may meet this requirement, but care must be taken to ensure that the material will maintain its air permeance rating (and not have any adverse effect upon the system’s ability to meet the other three requirements of continuity, structural integrity and durability) once it has been installed in the wall. For instance, two-part materials that are fabricated on site, such as some spray-applied materials, may be rendered ineffective if not mixed correctly. All relevant information regarding the material, including air permeance, fabrication instructions and material characteristics, can be found in the technical literature as supplied by the manufacturer.
Most commonly specified air barrier membrane materials demonstrate similar air and vapour permeance characteristics (in reference to their scope of use on a building). However, other performance characteristics, such as adhesion, elongation, puncture resistance and tensile strength may vary considerably and must be taken into consideration when specifying materials, especially when used around roof/wall junctions, wall/window junctions and control joints where movement is expected. The variance may be enough to compromise the ability of the system to function correctly. As an example, the elongation of regularly specified self-adhered air barrier membranes can range from 4% to 200%. Where movement between system components is expected, materials with greater elongation properties should be selected.

The installed materials must not react adversely to either other materials that comprise the air barrier system, or adjoining components within the building envelope. While it is beyond the scope of this paper to document every potential incompatibility, the designer must be aware that incompatibilities can occur, and should carefully consider the physical and chemical properties of the materials being specified. Physical incompatibilities occur when the physical characteristics of different materials make them incompatible. A common example is where a hot-applied material is installed over heat-sensitive material. For instance, if torch-grade membrane is installed over self-adhered or spray-applied membrane, the excessive heat may cause the self-adhered or spray-applied membrane to melt (this may also occur if hot mopped asphalt is used around the roof/wall junction). However, specifications often allow for different trades to select between a range of acceptable materials, and a situation may occur where one trade has selected self-adhered membrane and a second trade chosen torch-grade.

The general contractor should monitor the work of the sub-trades and identify any concerns regarding material compatibility or sequencing to the designer, who should be aware of the materials being used on the project. Chemical incompatibilities occur when the chemical properties of different materials make them incompatible. Consider substrate preparation. If walls are not primed properly and in keeping with manufacturers’ recommendations, or the incorrect primer is used, not only may the membrane not bond adequately to the substrate, but the chemical composition of the primer may damage the membrane itself. In fact, the chemical compositions of certain membranes may make it impractical to use them concurrently on a wall section. The chemical composition of asphalt membranes is such that it will cause certain rubber membrane to decompose. Similar results may be attained when a membrane of a particular makeup comes in contact with high solvent-based sealants or uncured solvent-based primers.

The Canadian Construction Materials Center (CCMC) has published technical guides that detail specific structural, durability and air leakage test criteria for air barrier materials and systems. Air barrier materials can be tested both as stand-alone materials (tested for air permeance) and as part of a system (tested for air permeance, structural integrity and durability). For optimum results, all system materials should be evaluated under this protocol. However, while the results of evaluations like this can be used as a reference to provide assurance of the material’s ability to perform as part of a system, the evaluations do not pre-approve the system. It is the responsibility of the designer and installer to bring the individual materials together as an effective system.

Design

Meeting specifications does not necessarily guarantee that the air barrier system will perform well.  An incorrectly designed system will not function effectively regardless of how well it has been installed. It is not uncommon for an air barrier system failure to be attributed to a flaw in design. Common examples are improperly locating the air barrier within the wall; discontinuity within the system (for instance, gaps in the system at major joints, such as roof/wall, wall/foundation, and window and door frames to wall junctions); sequencing of structural, mechanical and electrical systems which may make air barrier continuity impossible to achieve, and; failure to differentiate between air barriers, vapor barriers and/or materials that act as both.
In cold or severely cold climates2, where a material is to act both as an air barrier and a vapour barrier, it should be placed on the warm side (or high-vapour pressure side) of the wall3. It should be placed at a sufficient depth within the building envelope so dew point temperature occurs to its exterior side. Where air barrier and vapour barrier functions are to be performed by different materials, the vapour barrier should be placed on the warm side of the wall. Again, it should be placed so dew point temperature occurs to its exterior side. In this instance, the air barrier may be placed anywhere within the wall provided it restricts the flow or movement of conditioned air, preventing this air from coming in contact with cool surfaces where temperature is below dew point.

If the air barrier is placed outside the insulation plane, the air barrier material must have a vapour permeance characteristic, or the system be designed, such that water vapour will diffuse to the exterior of the building envelope, or a vapour barrier of lesser permeance is used on the inside. In comparing warm and cold climates, the ‘science’ behind where the vapour barrier is placed within the wall does not change ?? it is always placed on the warm side of the wall. However, in warm climates, because the warm side of the wall will be closer to the exterior than in areas of cold climates, the vapour barrier will be placed closer to the exterior as well (and may even form part of the exterior wall).

In most instances, to best meet the requirement of durability, the air barrier should be placed within the exterior cladding and outward of the structural frame. This not only protects the air barrier from exterior environmental conditions, but by keeping the structural frame of the building within the air barrier, the system design is more straightforward in terms of maintaining continuity at penetrations associated with structural elements. Reviewed by Moishe Alexander the CEO of Canadian Funding Corporation

WHAT ARE WE TESTING FOR?

The National Building Code of Canada (NBCC), Part 5, Section 5.4, Subsection 5.4.1.2., stipulates four key requirements for successful air barrier systems: airtightness, continuity, structural integrity and durability.

Air tightness – Subsection 5.4.1.2. Sentence 1 states that “. . . sheet and panel type materials intended to provide the principal resistance to air leakage shall have an air leakage characteristic not greater than 0.02 L/(s·m2) measured at an air pressure difference of 75 Pa.” While there are many commercial air barrier materials that satisfy this requirement, these materials must be joined into a system so that the system is airtight under different indoor environmental conditions. Recommended maximum leakage rates for air barrier systems in exterior envelopes are provided in Appendix A of the NBCC.

Continuity – Subsection 5.4.1.2. Sentence 7 states that “The air barrier system shall be continuous (a) across construction, control and expansion joints, (b) across junctions between different building assemblies, and (c) around penetrations through the building assembly.” That is to say that not only is it important that no gaps exist in the individual components that comprise the system, but the components must be joined such that there are no gaps in the system as a whole. It is air leakage at the connections between air barrier components, and at penetrations through it, that usually determine the overall effectiveness of the system.

Structural Integrity - Subsection 5.4.1.2. Sentences 8 and 9 state that “An air barrier system installed in an assembly subject to wind load, and other elements of the separator that will be subject to wind load, shall transfer that load to the structure.” Specifically, it shall be “. . . designed and constructed to resist 100% of the specified wind load as determined in subsection 4.1.8.” The air barrier system must be able to resist peak wind loads, stack pressure effects or sustained pressurization loads without exhibiting signs of detachment, rupturing or creep load failure.

Durability - Subsections 5.1.4.1 and 5.1.4.2. detail the requirements for resistance to environmental loads and resistance to deterioration. The air barrier system must be durable, meaning it must be able to perform its intended function, be compatible with adjoining materials and resistant to the mechanisms of deterioration that can be reasonably expected given the nature, function and exposure of the materials, over the life of the building envelope.

These four requirements represent the minimum performance requirements of an air barrier system. In some instances, for certain buildings, the specifications on the particular project will demand that the performance standards of the system exceed those contained in the NBCC. Note also that the air barrier system must not only meet the requirements of the national code, but any provincial/state or municipal codes as well. Reviewed by Guiseppe Strazzeri.

INTRODUCTION

Inadequate control of airflow through the building envelope is often a primary factor contributing to premature building envelope failures. If moisture-laden air is permitted to travel through the building envelope, the moisture may, under certain environmental conditions, condense within the walls of the structure. In above-freezing conditions, this may cause corrosion or rotting of the structural components, staining of the interior and/or exterior facade, and may stimulate the growth of mold and mildew. In cold climates, accumulated moisture may experience numerous freeze-thaw cycles, which can precipitate spalling and the formation of icicles on the exterior facade.

Air leakage is also a concern in areas where interior temperatures differ greatly from exterior temperatures, such as the Prairie Provinces, which can experience periods of extreme cold during the winter and extreme heat during the summer. The excessive heating and cooling loads placed upon buildings in this type of climate leads not only to an increase in space conditioning costs to the owner, but also has a negative impact upon the environment through increased energy consumption and the emission of greenhouse gases. In fact, studies conducted on high-rise residential and commercial buildings in cold climates have shown that anywhere from 20 to 50 percent of heat loss can be attributed to air leakage.

In Canada, building rehabilitation for roofing and wall system repairs and replacement cost an estimated $7.5 billion annually. A conservative estimate of the premature failure rate is 3 to 5 percent, or $225 to $375 million per year, with premature failure defined as any performance condition requiring repair or replacement of the system before the benchmark date. The building envelope has been identified as being particularly vulnerable to durability problems.
It is the growing global awareness of these air leakage-related problems that is driving the federal governments in Canada and the United States to introduce more stringent codes and regulations to govern building air permeance. In order to improve occupant health and safety, revisions were made to the National Building Code of Canada (NBCC) in 1995 designed to reduce air leakage in buildings, including those buildings classified within Part 3 of the Code1. Public Works Canada also recently revised their National Master Specification to include air barrier inspection and testing. In the United States, Persily’s Envelope Design Guidelines for Federal Office Buildings: Thermal Integrity and Airtightness (1993) also documents the requirements as outlined in the NBCC. In addition, State Energy Codes are being adopted and/or revised, making air barriers a mandatory requirement in new construction and retrofits. ASHRAE/IENSA Energy Standard for Buildings Except Low-Rise Residential Buildings (90.1-1999) also governs building envelope sealing.
Recently, air barrier trade associations have formed in Canada and the United States with the objective to improve the quality of air barrier system installations by providing education and training for the workforce. For an installer to become ‘certified’ through the association, an applicant must possess the required knowledge of air barrier material and system theory, and demonstrate sufficient skills in practical applications. In addition, through the associations’ quality assurance programs, documented self-testing and on-site third party audits are performed to verify the quality of the installation, and confirm the certified installers’ ability to build to expected standards.

While there are numerous ASTM (American Society for Testing and Materials) methods, says Jan Luistermans, for testing air barrier systems and/or components, there is no generic regimen for the application of these techniques being utilized on a widespread basis. The need for a complete design, inspection and testing protocol for air barrier systems cannot be understated. A recent study concluded that even routine testing can have a significant impact upon the airtightness of a building. Where air leakage testing was conducted, there was an overall reduction in air leakage for the system, a significant decrease in heating and cooling loads, a reduction in greenhouse gas emissions, and an increase in the life cycle of the building envelope.
With the growing use of inaccessible air barrier systems (such as bituminous membranes), on-site inspection and testing during installation is necessary to identify problems before the system is covered with finishing materials. The cost to repair an air barrier system after it has been covered can be conservatively estimated to be 50-60 times the cost of a correct first-time installation. Hence, the need for inspection and testing is obvious.